M/s. DB MINES, BAGALKOT.

BENEFICIATION PLANT

1. Installation and Commissioning of Beneficiation Plant of capacity 1 Million Ton Plant of BHQ Feed grade of 44 & upgrading to > Fe 63. 2. Tonnage = a) Equipment's- 1500 MT, b) Structure = 2500 MT, c) Civil- 10000 Cu.m

completed projects by Palmet completed projects by Palmet

M/s. JSW Group.

DE-DUSTING UNIT

Fabrication and Erection of De-Dusting unit and Structure. (140 MT)

completed projects by Palmet completed projects by Palmet

M/s. Kalyani Steel Ltd.

COKE OVEN PROJECT (CHIMNEY)

Fabrication and Erection of Chimney
a) Height - 50 mtr b) Dia - 4.5 mtr c) Weight - 250 MT d) Qty - 2 Nos

completed projects by Palmet completed projects by Palmet

COKE OVEN PROJECT (EQUIPMENT)

1. Erection, Alignment and Commissioning of Stamping Machine- 150 MT
(With laying cleaning pickling and Flushing of Hydraulic Pipe line)

completed projects by Palmet

COKE OVEN PROJECT (CONVEYOR AND EQUIPMENT)

1.Erection, Alignment and Commissioning of Conveyors and Equipments- i)Belt Conveyors ii)Grizzley iii)Hoppers iv)Crusher house v)Screeners vi)All Type of Chutes vii)Rod gates viii)Bag Filters

completed projects by Palmet completed projects by Palmet

BLAST FURNACE (MBF-2)

Shell, Structure, Staves, Equipments, Pipelines - 1800 Ton

completed projects by Palmet completed projects by Palmet

BLAST FURNACE (MBF-2) CONT'D

Shell, Structure, Staves, Equipments, Pipelines - 1800 Ton

completed projects by Palmet completed projects by Palmet

BLAST FURNACE (MBF-2) - COMMISSIONING CONT'D

SUCCESSFULL COMMISSIONING

completed projects by Palmet completed projects by Palmet

M/s. KRISHNA BANGARU MINERALS

UPGRADATION OF WASHING PLANT

DESIGN, MANUFACTURING, ERECTION AND COMMISSIONING OF WASHING PLANT - 180 MT

completed projects by Palmet completed projects by Palmet

M/s. Menera Steels and Power Pvt. Ltd.

MANUFACTURING AND SUPPLY (CONT'D)

Fabrication of Ladle with Trunnion

completed projects by Palmet

MSPL Limited

TG BUILDING EQUIPMENTS – PALLET PLANT

Assembly, Erection and alignment and commissioning of TG building Equipment's - 1900 MT

completed projects by Palmet completed projects by Palmet

TG BUILDING EQUIPMENTS - PALLET PLANT

Assembly, Erection and alignment and commissioning of TG building Equipment's (Palletizing discs)- 400 MT

completed projects by Palmet completed projects by Palmet

ESP PROCESS DUCT - PALLET PLANT

Fabrication, Erection and alignment of Technological structure (ESP process duct) - 500 MT

completed projects by Palmet completed projects by Palmet

M/s. MUKUND SUMI SPECIAL STEEL LTD.

RMS STEEL STRUCTURE

1.Supply and Erection of Visitor Gallery, PRL Walkways and Walking Beam Platform = Tonnage : 150 MT

completed projects by Palmet completed projects by Palmet

RMS STEEL STRUCTURE (CONT'D)

1.Fabrication and Erection of RMS Shed - Tonnage: 4000 MT Avg Output - 400 MT/Month
2.Total Tonnage = 4000 MT

completed projects by Palmet completed projects by Palmet

REHEATING FURNACE (RHF)

1. Manufacturing, Supply and Erection of RHF- 250 MT i) Body structure ii) Walkways iii) Equipment's v) Combustion air duct and structure

completed projects by Palmet completed projects by Palmet

REHEATING FURNACE (RHF) CONT'D

1.Manufacturing, Supply and Erection of RHF
i) Chimney (4.5 mtr dia at bottom and 80 mtr height)-Natural draught - 150 MT
ii) Waist Gas Duct- 80 MT

completed projects by Palmet completed projects by Palmet

REHEATING FURNACE (RHF) CONT'D

1. Fixing of anchors for Refractory in i) Inside RHF body structure ii) Skid pipes iii) Flow Gas duct ii) Chimney, chute, etc and Pipeline work 3.Total Tonnage = 800 MT

completed projects by Palmet completed projects by Palmet

COIL HANDLING AREA (CHA)

1. Installation, Alignment and Commissioning of all CHA Equipment's
2. Tonnage - 600 MT

completed projects by Palmet completed projects by Palmet

WIRE ROD LINE (WRL)

1.Installation, Alignment and Commissioning of Wire Rod Line Equipment's Tonnage - 650 MT

completed projects by Palmet completed projects by Palmet

EOT CRANE

1.Dismantling, Shifting, Assembly and Re-Installation of EOT Crane Including Electrical wiring - Capacity - 25 Ton

completed projects by Palmet completed projects by Palmet

MANUFACTURING AND SUPPLY (CONT'D)

Billet Storage Stands - Design, Manufacturing, Supply and Installation. Purpose - To store the caster Billets with safety - 200 Ton

completed projects by Palmet

MANUFACTURING AND SUPPLY (CONT'D)

SS Coil Carrier Spiders: To carry the hot coil in furnace - 42 Nos

completed projects by Palmet completed projects by Palmet

MAGNETIC PARTICLE INSPECTION (MPI)

Production - 1500 MT/Month. Capacity: 1500MT/Month

completed projects by Palmet completed projects by Palmet

MANUFACTURING AND SUPPLY (CONT'D)

Billet Storage Stands - Design, Manufacturing, Supply and Installation. Purpose - To store the caster Billets with safety - 200 Ton

completed projects by Palmet

M/s. Ranjitpura Infrastructure Pvt. Ltd.

BENEFICIATION PLANT

1.Consultancy, Fabrication & Erection of steel structure for washing and crushing plant at RIPL Site .Engineering & Consultation service including Basic Engineering, Detail engineering & Layout Finalization, Process Flow Development, Mass water & FE balancing, Detailed Engineering (BOQ), Drawing & Documents, Pipe Line 2 D Drawing, 2D P & ID Drawing, Control Philosophy, Commissioning Assistance. 3) Iron ore slurry line design, engieeirng, supply & commissioning- about 2 Km & flow 150 Cu.m/Hr 4).Structural steel Fabrication, Erection - 400 MT. Note: This plant is Re-constructing at another location due to Forest issue.

completed projects by Palmet

M/s. Resources Pallets Concentrates Pvt. Ltd. (RPCL)

IRON ORE BENEFICIATION PLANT

TOWER MILL - Erection and Alignment - Tonnage - 160 MT

completed projects by Palmet completed projects by Palmet

IRON ORE BENEFICIATION PLANT

Fabrication, Erection and Alignment of Thickener and its Structure. Diameter - 36 Mtr Tonnage – 160 MT

completed projects by Palmet completed projects by Palmet

IRON ORE BENEFICIATION PLANT

TECHNOLOGICAL STRUCTURE Like Dump hoppers, Cloth washer Tank, Mag collection sump, Scalping cyclone sump - Fabrication and Erection. Tonnage - 280 MT

completed projects by Palmet completed projects by Palmet

IRON ORE BENEFICIATION PLANT

EQUIPMENTS- CONCENTRATE FILTERS - Erection and Alignment Tonnage - 280 MT

completed projects by Palmet completed projects by Palmet

IRON ORE BENEFICIATION PLANT

EQUIPMENTS- CONCENTRATE FILTERS - Erection and Alignment Tonnage - 280 MT

completed projects by Palmet

IRON ORE BENEFICIATION PLANT

PIPE and CABLE GALLERY - Fabrication and Erection Tonnage - 250 MT

completed projects by Palmet

IRON ORE BENEFICIATION PLANT

ROM Conveyor - Erection and Alignment Tonnage - 200 MT

completed projects by Palmet

IRON ORE BENEFICIATION PLANT

MAG BUILDING - Fabrication and Erection. Tonnage - 400 MT

completed projects by Palmet completed projects by Palmet

IRON ORE BENEFICIATION PLANT

Fabrication, Erection and Alignment of Slurry Tank Diameter - 15 mtr, Height - 17 Mtr

completed projects by Palmet completed projects by Palmet

TAILING FILTER PRESS BUILDING

Erection and alignemnt of Tailing filter press equipment - 350 MT Fabrication and Erection of Tailing building structure - 250 MT

completed projects by Palmet completed projects by Palmet

M/s. SLR Metaliks Ltd.

BILLET CASTER (CONTINUOUS CASTING MACHINE) CCM

Plant capacity 0.3 MTPA Job Description: Production of Billets
1. Erection, Alignment and commissioning of equipment's = 1000 MT
2. Fabrication & Erection of complete Structure-Tonnage = 900 MT
3. Fabrication & Laying of various Pipeline = 180000 Inch Meter

completed projects by Palmet completed projects by Palmet

PUMP HOUSE

1. Integrated Pump House
2. GCP Pump House
3. Raw Water Pump House
4. Compressor House

completed projects by Palmet completed projects by Palmet

CHIMNEY OF AFBC BOILER PROJECT

1. Fabrication and erection of chimney for AFBC boiler 2. Height: 60 Mtr, Qty: 1 Nos, Weight: 100 MT

completed projects by Palmet completed projects by Palmet

RE-HEATING FURNACE (RHF)

1. Fabrication and erection of bf gas pipeline & it's structure of walkable reheating furnace project-Tonnage = 150 MT

completed projects by Palmet completed projects by Palmet

ENERGY OPTIMIZING FURNACE (EOF)

1. Fabrication and erection of 35/40 TON EO Furnace and Assembly (Designed for upgradation)

completed projects by Palmet completed projects by Palmet

VD VESSEL

Installation of VD VESSEL (upgraded at in-house) - Capacity: 40 TONS

completed projects by Palmet completed projects by Palmet

MBF-2 BFG DUCT

FABRICATION AND ERECTION OF MBF-2 BFG DUCT, STRUCTURE & EQUIPMENT WORK - 1300 MT

completed projects by Palmet completed projects by Palmet completed projects by Palmet completed projects by Palmet

MBF-2 - FLARE STACK CHIMNEY

FABRICATION AND ERECTION OF MBF-2 FLARE STACK CHIMNEY - 160 MT

completed projects by Palmet completed projects by Palmet

MBF-2 - TOP STRUCTURE

FABRICATION AND ERECTION OF MBF-2 TOP STRUCTURE - 150 MT

completed projects by Palmet completed projects by Palmet

MBF-2 - PIPELINE WORK

FABRICATION AND ERECTION OF MBF-2 PIPELINE WORK INCLUDING PUMPHOUSE EUIPMENTS - 250000 INCH-MTR

completed projects by Palmet completed projects by Palmet completed projects by Palmet

MBF-2 - PCI WORK

FABRICATION AND ERECTION OF MBF-2 PCI TECHNOLOGIAL STRUCTURE - 160 MT FABRICATION & ERECTION OF MBF-2 PCI DUCT WORK - 150 MT ERECTION OF MBF-2 PCI EQUIPMENTS - 320 MT

completed projects by Palmet completed projects by Palmet

MBF-2 - PUMP HOUSE STRUCTURALSHED

MANUFACTURING, SUPPLY AND ERECTION OF MBF-2 PUMP HOUSE SHED AND COMPRESSOR SHED WITH STEEL – 120 MT

completed projects by Palmet completed projects by Palmet

BLOWER HOUSE

Assembly, Erection and alignment of blower house duct and equipment's - 160 MT

completed projects by Palmet

BLAST FURNACE (SHUTDOWN WORK)

Revamping of Furnace shell, Staves, Equipments, Stove upgradation - 800 Ton

completed projects by Palmet completed projects by Palmet completed projects by Palmet

COKE OVEN PROJECT (IN PROGRESS)

FABRICATION AND ERECTION OF BUILDING AND TECHNOLOGICAL STRUCTURE - 2000 MT ERECTION AND ALIGNMENT OF EUIPMENT - 2500 MT

completed projects by Palmet completed projects by Palmet

COKE OVEN PROJECT - CONT'D

FABRICATION AND ERECTION OF BUILDING AND TECHNOLOGICAL STRUCTURE - 2000 MT ERECTION AND ALIGNMENT OF EUIPMENT - 2500 MT

completed projects by Palmet completed projects by Palmet

MBF-1 PROJECT

Total Water, Oxygen, Nitrogen pipeline & BF Gas line. - 50000 Inch meter.

completed projects by Palmet completed projects by Palmet

Fabrication and Erection of Pipeline work like Water, Compressed Air, Nitrogen & BF Gas line- 50,000 Inch meter.

completed projects by Palmet

ESP (ELECTROSTATIC PRECIPITATOR): HEAD & TAIL

ESP, DE dusting, Proportionate building.
- Fabrication and Erection of Structure.(100 MT)
- Installation of Equipment's.( 50 MT) - Pipeline works.(2000 Inch-Mtr)

completed projects by Palmet completed projects by Palmet

ABG SHED STRUCTURE (KL BAY)

Fabrication and Erection of ABG Shed Structure (KL bay)
a) Steel Structure - 150 MT. b) Crane Rail - 100 Mtr

completed projects by Palmet completed projects by Palmet

Palmet Engineering LLP

PALMET ENGINEERING - WORKSHOP YARD

Manufacturing Unit size: 28 Mtr x 50 Mtr
Over head crane capacity : 12 Ton
Power capacity : 65 HP
Total Size includes fabrication yard, store, office - 100 Mtr x 240 Mtr

completed projects by Palmet

Palmet Engineering - Fabrication Yard

Manufacturing Unit size: 28 Mtr x 50 Mtr
Over head crane capacity : 12 Ton
Power capacity : 65 HP
Total Size includes fabrication yard, store, office - 100 Mtr x 240 Mtr