CLIENT : M/s. Kalyani steel Ltd.

BLAST FURNACE (MBF-2)
MBF-2, Plant Capacity: 319 M3, Technology Supplier: SDM, China, Year: 2026

Shell, Structure, Staves, Equipments, Pipelines - 1800 Ton

completed projects by Palmet completed projects by Palmet completed projects by Palmet

BLAST FURNACE (MBF-2) - CONT'D

Shell, Structure, Staves, Equipments, Pipelines - 1800 Ton

completed projects by Palmet completed projects by Palmet completed projects by Palmet

BLAST FURNACE (MBF-2) - COMMISSIONING CONT'D

SUCCESSFULL COMMISSIONING

completed projects by Palmet completed projects by Palmet completed projects by Palmet

CLIENT : M/s. SLR Metaliks Ltd

BLAST FURNACE (SHUTDOWN WORK)

Revamping of Furnace shell, Staves, Equipments, Stove upgradation- 800 Ton

completed projects by Palmet completed projects by Palmet completed projects by Palmet

MBF-2 - TOP STRUCTURE

FABRICATION AND ERECTION OF MBF-2 TOP STRUCTURE - 150 MT

completed projects by Palmet completed projects by Palmet

MBF-2 - PCI WORK
PCI, Plant Capacity: 12 T/hr, Technology Supplier: ANDE METALURGICAL, China, Year: 2026

FABRICATION AND ERECTION OF MBF-2 PCI TECHNOLOGIAL STRUCTURE - 160 MT FABRICATION AND ERECTION OF MBF-2 PCI DUCT WORK - 150 MT ERECTION OF MBF-2 PCI EQUIPMENTS - 320 MT

completed projects by Palmet completed projects by Palmet

MBF-2 BFG DUCT
MBF-2, Plant Capacity: 262 M3 , Technology Supplier: MECON Ltd., Year: 2025

FABRICATION AND ERECTION OF MBF-2 BFG DUCT, STRUCTURE AND EQUIPMENT WORK - 1300 MT

completed projects by Palmet completed projects by Palmet completed projects by Palmet completed projects by Palmet

MBF-2 - FLARE STACK CHIMNEY

FABRICATION AND ERECTION OF MBF-2 FLARE STACK CHIMNEY - 160 MT

completed projects by Palmet completed projects by Palmet

MBF-2 - PIPELINE WORK

FABRICATION AND ERECTION OF MBF-2 PIPELINE WORK INCLUDING PUMPHOUSE EUIPMENTS - 250000 INCH-MTR

completed projects by Palmet completed projects by Palmet completed projects by Palmet completed projects by Palmet

MBF-2 - PUMP HOUSE STRUCTURALSHED

MANUFACTURING, SUPPLY AND ERECTION OF MBF-2 PUMP HOUSE SHED AND COMPRESSOR SHED WITH STEEL - 120 MT

completed projects by Palmet completed projects by Palmet

ABG SHED STRUCTURE (KL BAY)
Shed Structure, Technology Supplier: Korus Engineering, Year: 2014

Fabrication and Erection of ABG Shed Structure (KL bay) - a) Steel Structure- 150 MT b) Crane Rail - 100 Mtr
- Fabrication and Erection of Structure. (100 MT)
- Installation of Equipment's. ( 50 MT)
- Pipeline works. (2000 Inch-Mtr)

completed projects by Palmet completed projects by Palmet

PUMP HOUSE

1. Integrated Pump House
2. GCP Pump House
3. Raw Water Pump House
4. Compressor House

completed projects by Palmet completed projects by Palmet

BLOWER HOUSE

Assembly, Erection and alignment of blower house duct and equipment's - 160 MT

completed projects by Palmet

ESP (ELECTROSTATIC PRECIPITATOR): HEAD & TAIL

ESP, DE dusting, Proportionate building
- Fabrication and Erection of Structure. (100 MT)
- Installation of Equipment's. (50 MT)
- Pipeline works. (2000 Inch-Mtr)

completed projects by Palmet completed projects by Palmet

MBF-1 PROJECT
MBF-1, Plant Capacity: 262 M3, Technology Supplier: MECON Ltd., Year: 2026

Total Water, Oxygen, Nitrogen pipeline & BF Gas line. - 50000 Inch meter

completed projects by Palmet completed projects by Palmet

ENERGY OPTIMIZING FURNACE (EOF)
EOF, Plant Capacity: 35 MT, Technology Supplier: Minitec, Brazil, Year: 2017

Fabrication and erection of 35/40 TON EO Furnace and Assembly (Designed for upgradation)

completed projects by Palmet completed projects by Palmet

BILLET CASTER (CONTINUOUS CASTING MACHINE) CCM
CCM, Plant Capacity: 9/16, Technology Supplier: SMS Concast, India, Zurich, Year: 2014

Plant capacity 0.3 MTPA
Job Description: Production of Billets
1. Erection, Alignment and commissioning of equipment's - 1000 MT
2. Fabrication & Erection of complete Structure-Tonnage - 900 MT
3. Fabrication & Laying of various Pipeline - 180000 Inch Meter

completed projects by Palmet completed projects by Palmet

RE-HEATING FURNACE (RHF)
Reheating Furnace (RHF), Plant Capacity: 50 TPH, Technology Supplier: Shenwu, Year: 2014

Fabrication and erection of bf gas pipeline & it's structure of walkable reheating furnace project-Tonnage - 150 MT

completed projects by Palmet completed projects by Palmet

SINTER PLANT
Plant Capacity: 0.35 MTPA, Technology Supplier: CMEPC, China, Year: 2012

Fabrication and Erection of Pipeline work like Water, Compressed Air, Nitrogen & BF Gas line - 50,000 Inch meter

completed projects by Palmet

VD VESSEL

Installation of VD VESSEL (upgraded at in-house), Capacity : 40 TONS (Designed for upgradation)

completed projects by Palmet completed projects by Palmet

PUMP HOUSES AND OTHER PROJECTS

1. MBF Pump House.
2. GCP Pump house.
3. Raw Water Pump House.
4. PCM Pump house.
5. Sinter Plant Pump House.
6. SGP Pump House
7. Air Compressor Room
8. DM Plant
9. Water Treatment Plant
10. Power Plant

CLIENT : M/s. SLR Metaliks Ltd. - COKE OVEN PROJECT

COKE OVEN PROJECT ( IN PROGRESS)
Structure - Conveyor Galley and Hoppers, Technology Supplier: SDM China, Year: 2026

FABRICATION & ERECTION OF BUILDING AND TECHNOLOGICAL STRUCTURE - 2000 MT ERECTION & ALIGNMENT OF EQUIPMENT - 2500 MT

completed projects by Palmet completed projects by Palmet completed projects by Palmet

COKE OVEN PROJECT (CONT'D)

FABRICATION & ERECTION OF BUILDING AND TECHNOLOGICAL STRUCTURE - 2000 MT ERECTION & ALIGNMENT OF EQUIPMENT - 2500 MT

completed projects by Palmet completed projects by Palmet completed projects by Palmet

COKE OVEN PROJECT (CONT'D)
Technology Supplier: SDM China, Year: 2026

Equipment - Battery Anchorage

completed projects by Palmet completed projects by Palmet

CLIENT : M/s. MSPL Ltd. Somalapura

TG BUILDING EQUIPMENTS - PALLET PLANT
TG Building, Plant Capacity: 3 MTPA, Technology Supplier: MECC (Sino Steel China), Year: 2025

Assembly, Erection and alignment and commissioning of TG building Equipment's - 1900 MT

completed projects by Palmet completed projects by Palmet

TG BUILDING EQUIPMENTS - PALLET PLANT

Assembly, Erection and alignment and commissioning of TG building Equipment's - 1900 MT

completed projects by Palmet completed projects by Palmet

ESP PROCESS DUCT - PALLET PLANT

Fabrication, Erection and alignment of Technological structure (ESP process duct) - 500 MT

completed projects by Palmet completed projects by Palmet completed projects by Palmet

CLIENT : M/s. Resources pallets concentrates Pvt. Ltd (RPCL)

IRON ORE BENEFICIATION PLANT
Concentrate Filters, Plant Capacity: 3.5 MTPA, Technology Supplier: METSO, Year: 2024

EQUIPMENTS- CONCENTRATE FILTERS - Erection and Alignment - Tonnage - 280 MT

completed projects by Palmet completed projects by Palmet

IRON ORE BENEFICIATION PLANT
Tower Mill, Plant Capacity: 3.5 MTPA, Technology Supplier: NIPPON EIRICH, Year: 2023

TOWER MILL - Erection and Alignment - Tonnage - 160 MT

completed projects by Palmet completed projects by Palmet

IRON ORE BENEFICIATION PLANT
Thickener, Plant Capacity: 36 Mtr dia, Technology Supplier: DELOKOR, Year: 2023

Fabrication, Erection and Alignment of Thickener and its Structure. - Diameter- 36 Mtr - Tonnage – 160 MT

completed projects by Palmet completed projects by Palmet

IRON ORE BENEFICIATION PLANT
Structurer, Technology Supplier: FEtech, Year: 2023

TECHNOLOGICAL STRUCTURE Like Dump hoppers, Cloth washer Tank, Mag collection sump, Scalping cyclone sump - Fabrication and Erection - Tonnage - 280 MT.

completed projects by Palmet completed projects by Palmet completed projects by Palmet completed projects by Palmet

IRON ORE BENEFICIATION PLANT

AIR RECEIVER TANKS - Fabrication, Erection and Alignment - Tonnage - 70 MT

completed projects by Palmet

IRON ORE BENEFICIATION PLANT

PIPE and CABLE GALLERY - Fabrication and Erection - Tonnage - 250 MT

completed projects by Palmet

IRON ORE BENEFICIATION PLANT

MAG BUILDING - Fabrication and Erection - Tonnage - 400 MT

completed projects by Palmet completed projects by Palmet

IRON ORE BENEFICIATION PLANT

ROM Conveyor - Erection and Alignment - Tonnage - 200 MT

completed projects by Palmet

IRON ORE BENEFICIATION PLANT

Fabrication, Erection and Alignment of Slurry Tank - Diameter - 15 mtr, Height - 17 Mtr

completed projects by Palmet completed projects by Palmet

TAILING FILTER PRESS BUILDING

- Erection and alignemnt of Tailing filter press equipment- 350 MT
- Fabrication and Erection of Tailing building structure- 250 MT

completed projects by Palmet completed projects by Palmet

CLIENT : M/s. MUKUND SUMI SPECIAL STEEL LTD.

REHEATING FURNACE (RHF)
Reheating Furnace (RHF), Plant Capacity: 40 TPH, Technology Supplier: SMS Group, Year: 2020

Manufacturing, Supply and Erection of RHF- 250 MT - i) Body structure ii) Walkways iii) Equipment's v) Combustion air duct and structure

completed projects by Palmet completed projects by Palmet

REHEATING FURNACE (RHF) CONT'D

Manufacturing, Supply & Erection of RHF i) Chimney ( 4.5 mtr dia at bottom & 80 mtr height)-Natural draught -150 MT i) Waist Gas Duct- 80 MT

completed projects by Palmet completed projects by Palmet

REHEATING FURNACE (RHF) CONT'D

Fixing of anchors for Refractory in i) Inside RHF body structure ii) Skid pipes iii) Flow Gas duct ii) Chimney, chute, etc and Pipeline work, Total Tonnage - 800 MT

completed projects by Palmet completed projects by Palmet

WIRE ROD LINE (WRL)
Wire Rod Mill, Technology Partner: SMS Group, Year: 2020

Installation, Alignment and Commissioning of Wire Rod Line Equipment's Tonnage - 650 MT

completed projects by Palmet completed projects by Palmet

COIL HANDLING AREA (CHA)
CHA, Technology Supplier: SMS Group, Year: 2020

Installation, Alignment and Commissioning of all CHA Equipment's Tonnage - 600 MT

completed projects by Palmet completed projects by Palmet

EOT CRANE
EOT Cranes, Plant Capacity: 20 Ton, Technology Supplier: Mukand Limited, Year: 2020

Dismantling, Shifting, Assembly and Re-Installation of EOT Crane Including Electrical wiring - Capacity - 25 Ton

completed projects by Palmet completed projects by Palmet

BILLET GRINDING MACHINE SFG MACHINE
Billet Storage Stand, Technology Supplier: Palmet Engineering LLP, Year: 2020

Production- 5000 MT/Month Capacity : 7000 MT/Month

completed projects by Palmet

RMS STEEL STRUCTURE
Rolling Mill Shed Structure, Technology Supplier: Koruse Engineering, Year: 2020

Supply and Erection of Visitor Gallery, PRL Walkways and Walking Beam Platform – Tonnage : 150 MT

completed projects by Palmet completed projects by Palmet

RMS STEEL STRUCTURE (CONT'D)

Fabrication and Erection of RMS Shed - Tonnage: 4000 MT - Avg Output - 400 MT/Month - Total Tonnage - 4000 MT

completed projects by Palmet completed projects by Palmet

MANUFACTURING AND SUPPLY (CONT'D)

SS Coil Carrier Spiders: To carry the hot coil in furnace - 42 Nos

completed projects by Palmet completed projects by Palmet

MANUFACTURING AND SUPPLY (CONT'D)

SS Coil Carrier Spiders: To carry the hot coil in furnace - 42 Nos

completed projects by Palmet

MAGNETIC PARTICLE INSPECTION (MPI)

Production- 1500 MT/Month - Capacity: 1500MT/Month

completed projects by Palmet completed projects by Palmet

CLIENT : M/s. Kalyani steel Ltd. - Coke Oven Project

COKE OVEN PROJECT (CHIMNEY)
Chimney, Technology Supplier: Mechon/Sickon, Year: 2022

Fabrication and Erection of Chimney a) Height- 50 mtr b) Dia- 4.5 mtr c) Weight- 250 MT d) Qty - 2 Nos

completed projects by Palmet completed projects by Palmet completed projects by Palmet

COKE OVEN PROJECT (EQUIPMENT)
Stamping Machine, Technology Supplier: DHHI/TZCO, China, Year: 2022

Erection, Alignment and Commissioning of Stamping Machine- 150 MT (With laying cleaning pickling and Flushing of Hydraulic Pipe line)

completed projects by Palmet

COKE OVEN PROJECT (CONVEYOR AND EQUIPMENT)
Shed Structure, Technology Supplier: Hyquip System Ltd., Year: 2022

Erection, Alignment & Commissioning of Conveyors and Equipments- i) Belt Conveyors ii) Grizzley iii) Hoppers iv) Crusher house v) Screeners vi) All Type of Chutes vii) Rod gates viii) Bag Filters.

completed projects by Palmet completed projects by Palmet

CLIENT : M/s. MInera steels and power pvt ltd.

MANUFACTURING AND SUPPLY (CONT'D)

Fabrication of Ladle with Trunnion

completed projects by Palmet

CLIENT : M/s. Ranjitpura Infrastructure pvt Ltd.

BENEFICIATION PLANT
Beneficiation plant - EPC, Plant Capacity: 0.48 MTPA, Technology Supplier: Palmet Engineering LLP, Year: 2006

1.Consultancy, Fabrication & Erection of steel structure for washing and crushing plant at RIPL Site. 2.Engineering & Consultation service including Basic Engineering, Detail engineering & Layout Finalization, Process Flow Development, Mass water & FE balancing, Detailed Engineering (BOQ), Drawing & Documents, Pipe Line 2 D Drawing, 2D P & ID Drawing, Control Philosophy, Commissioning Assistance. 3) Iron ore slurry line design, engieeirng, supply & commissioning- about 2 Km & flow 150 Cu.m/Hr 4).Structural steel Fabrication, Erection – 400 MT. Note: This plant is Re-constructing at another location due to Forest issue.

completed projects by Palmet

BENEFICIATION PLANT

Thickner Shifting - BE, DE & Construction done by Palmet

completed projects by Palmet completed projects by Palmet

CLIENT : M/s. KRISHNA BANGARU MINERALS

UPGRADATION OF WASHING PLANT
Washing plant upgradation- EPC, Plant Capacity: 100 TPH, Technology Supplier: Palmet Engineering LLP, Year: 2025

DESIGN, MANUFACTURING, ERECTION AND COMMISSIONING OF WASHING PLANT- 180 MT

completed projects by Palmet completed projects by Palmet completed projects by Palmet

CLIENT : M/S. DB MINES, Bagalkot

Beneficiation Plant

Installation and Commissioning of Beneficiation Plant of capacity 1 Million Ton Plant of BHQ Feed grade of 44 & upgrading to > Fe 63. Tonnage a) Equipment’s- 1500 MT b) Structure – 2500 MT, c) Civil- 10000 Cu.m

completed projects by Palmet completed projects by Palmet

CLIENT : M/s. JSW

DE-DUSTING UNIT, Year: 2006

Fabrication and Erection of De-Dusting unit and Structure. (140 MT)

completed projects by Palmet completed projects by Palmet

Ongoing Works at Site

completed projects by Palmet